kt
/ENG        
 

气体工程

以下是我们自2001年成立以来曾参于的重要工程项 目

  • 2012s-現在

2012

    - Gas Heater Emission Test

2014

    - GRS Inlet & Outlet Filter Replacement
    - Overhauling the Brower Motor of GRS Sale Gas Heater #6

2015

    - Overhauling the Brower Motor of GRS Sale Gas Heater #1
    - CR for GRS 2015 Metering Tube Cleaning

2016

    - Overhauling the Brower Motor of GRS Sale Gas Heater #1

2017

    - Overhauling the Brower Motor of GRS Sale Gas Heater #1
    - Hitachi 132kV GIS Refurbisment


2010

    - Installation of 11kV Cables and Cable Tray System for FGD Loads
    - Mody Road Transformer Replacement work
    - City of dreams CEM Substation Extension

2011

    - Black Point Gas Supply Project Construstion Works (M2554/SC/020)

2012


    - Black Point Gas Supply Project Construstion Works (M2554/SC/020)
    - Gas Heater Emission Test
    - Installation and Testing Assistance of 400MVA 275/16kV Unit 9 Generator Transformers
    - Installation and testing Assistance of Standby Unit 9, GT57 and Common Transformers
    - Replacemenr of Existing Transformers and Installation of new 132/6.6kV Transformer No.1 & No.2 with Associated Equipment
    - Installation 6.6kV switchgear Unit C3
    - Replace the corrosive air duct of #3 Heater in GRS Hong Kong

2013


    - Black Point Gas Supply Project Construstion Works (M2554/SC/020)
    - Sub-Contract No.H2514-ME - 3536 Supply Pipe Fitters for Piping Work for Plant A & B

2014

    - GRS Inlet & Outlet Filter replacement
    -Overhaul the blower motor og GRS sale gas heater #6
    - Replacement of #6 Heater Tank

2015

    - Replacement of #6 Heater Tank
    - Overhual the blower motor of GRS sale gas heater#1
    - CR for GRS 2015 Metering tube cleaning
    - Hitachi 132kV GIS Refurbisment
    - Tx Oil Replacement in GBG

2016

    - Hitachi 132kV GIS Refurbisment
    - 龍鼓灘末站運行維護服務
    - Generator Transformer Bushing Replacement

2017

    - Hitachi 132kV GIS Refurbisment
    - 龍鼓灘末站運行維護服務
    - Generator Transformer Bushing Replacement
    - 龍鼓灘末站運何維修服務西氣東輸香港支線管道清管作業

2018

    - 龍鼓灘末站運行維護服務
    - Generator Transformer Bushing Replacement
    - 2018年香港終端日常維修服務

 

回到:业务范围>气体工程